Sewage pump station - two pumps

2-pump lifting station for waste water and loaded water. Not sure which model? Follow our guide to choosing a sewage pump station: how it works, one or two pumps, tank, lifting height.

Active filters
Station de relevage eaux chargées DRAIN'UP 2 pompes Station de relevage eaux chargées DRAIN'UP 2 pompes 2
5 to 8 days
Sewage pump station - two pumps
$3,780.18

$3,780.18 tax excl.

Delivery 5 to 8 days

The Drain'up D42UP and D42UGP lifting stations are equipped with KSB Ama Porter 501 pumps. Polyethylene tank with screw-on lids, pumps mounted on tripods or on base stands with guide rails.
Showing 1-1 of 1 item(s)

Practical information

Need advice? Our team is available (Monday - Friday: 8:30-12:00 and 13:00-16:30).

Contact us

Delivery

  • Same-day dispatch for orders placed before 12 noon, in most cases.
  • Colissimo without signature in mainland France, delivery within 2 to 3 days.
  • Chronopost on request.
  • DB SCHENKER transport for oversized parcels: delivery to your freight forwarder in France, with guaranteed tracking.
Delivery terms

Two pumps to make lifting more reliable

A two-pump lifting station combines a tank and two pumps to move wastewater or dirty water to a drain located higher up. It suits apartment buildings, commercial premises and sites where a lifting failure is not acceptable.

What the double equipment brings

  • Backup: if one pump fails, the other takes over.
  • Alternation of the pumps to share wear.
  • Increased flow possible when a lot of water arrives, depending on the model.

Frequently asked questions: Two-pump lifting stations

When should I choose a two-pump station rather than a single one?

When a lifting stoppage would cause significant problems (backflow, interrupted activity) or when use is intensive. For an occasional need, a single pump may be enough.

Which characteristics should I check before buying?

Check the tank volume, the discharge diameter, the lifting height, the impeller type and the power supply. These values are given on the product page.

What should I plan for the installation?

Ventilation of the tank, non-return valves, access for maintenance and a level alarm are recommended. Follow the manufacturer's instructions and local regulations.

Do you need advice before buying?

Our team helps you choose the right equipment for your installation: call +33 3 44 25 91 01 Monday to Friday, 8:30 am to 12:00 pm and 1:00 pm to 4:30 pm (French time), or email contact@pompes-h2o.com. Public bodies can pay by administrative order (mandat administratif), with invoicing through Chorus Pro.